PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing insulation at the 1st floor Sprinkler Room Facing South.jpg Installing rebar at the slab on grade Boiler-Electrical Room Facing West.jpg Laying out block at Stair -3 Facing West.jpg Waterproofing the shear wall at the South Elevation.jpg Block work at Stair -3 Facing North-West.jpg
Next page Installing insulation at the 1st floor Sprinkler Room Facing South
Installing insulation at the 1st floor Sprinkler Room Facing South